top of page

BCIN-Certified Deck & Garage Permit Drawings in Ottawa, ON

Planning a backyard construction project in the Nation's Capital? Navigating Ottawa’s zoning bylaws, setback rules, and the City of Ottawa Building Code Services review process can quickly derail your construction timeline.

​

At Fast Track Plans, we draft BCIN-certified blueprint packages engineered specifically for Ottawa’s My ServiceOttawa online portal, helping homeowners and contractors get fast, stress-free permit approvals.

1 

Do You Need a Building Permit in Ottawa?

Under the Ontario Building Code and City of Ottawa regulations, you legally require a building permit if your project involves:

  • Decks:

    • Any deck attached or adjacent to your home with a walking surface more than 24 inches (600 mm) above finished grade.

    • Any deck that serves as the principal entrance to your dwelling.

    • Any freestanding deck that is both greater than 108 sq. ft. (10 m²) in size AND elevated more than 24 inches (600 mm) above grade.

  • Detached Garages: Any accessory building or detached garage occupying an area greater than 108 sq. ft. (10 m²).

  • Sheds: Any single-storey storage shed exceeding 161 sq. ft. (15 m²), or any shed containing plumbing regardless of size.

Ottawa Bylaw Reminder: Even if a low-profile, freestanding deck or small shed does not require a structural building permit, it must still comply with local zoning bylaws regarding property line setbacks and maximum lot coverage.

2

What’s Included in Our Ottawa Permit Drawing Packages?

City of Ottawa plans examiners require detailed, professionally scaled drawings to issue a permit. Every package we create includes:

  1. Framing & Foundation Plan: Complete structural layouts showing footing locations (extending below Ottawa’s frost line), post sizing, beam dimensions, and joist spans.

  2. Elevations: Exterior profile views showing overall structure height, stair configurations, and guardrail heights meeting Ontario safety standards.

  3. Cross-Sections & Structural Details: Explicit assembly cut-throughs illustrating ledger board attachments, footing depth, and rail post anchoring.

  4. BCIN Stamp & Schedule 1 Form: Official designer identification and completed documentation required for direct digital submission.

3

How to Get Your Ottawa Permit Approved

  1. Submit Your Site Measurements: Provide us with your project details, dimensions, and property survey (if available).

  2. We Draft Your Blueprints: Our BCIN-qualified designers construct your permit-ready plan set in days.

  3. Submit Online: Upload your digital PDF package directly via the My ServiceOttawa portal.

  4. Receive Your Permit & Build: Ottawa building examiners review residential submissions (typically within 10–15 business days), clear your plans, and you can begin construction!

4

Ready to Start Your Ottawa Backyard Project?

Avoid the frustration of rejected sketches and municipal delays. Get affordable, BCIN-certified permit plans starting at $500 + HST.

Kingston Real.png
bottom of page